Transportation & Mobility
Toll Plaza Technology
Toll Plaza Technology, engineered as part of one environment.
Toll Plaza Technology brings ANPR / LPR, Boom Barriers, Intelligent Traffic Systems together around a clear operational brief. Survey lane geometry, vehicle speed, lighting and the applicable operating model.
The challenge
Toll lanes need reliable vehicle identification and safe lane control under variable traffic, weather and exception conditions.
Our approach
- 01Survey lane geometry, vehicle speed, lighting and the applicable operating model.
- 02Coordinate ANPR, lane controllers, barriers and vehicle detection for each lane type.
- 03Define transaction exceptions, operator intervention and back-office responsibilities.
- 04Test capture, safe actuation, communications loss and queue-management scenarios.
System architecture
How it fits together.
Layer 01
ANPR / LPR
ANPR / LPR supplies a defined capability in toll plaza technology; interfaces, ownership, operating rules and acceptance are set during project design.
Layer 02
Boom Barriers
Boom Barriers enforces an approved entry or movement rule, with safe states, permissions and exception handling defined for toll plaza technology.
Layer 03
Intelligent Traffic Systems
Intelligent Traffic Systems supplies a defined capability in toll plaza technology; interfaces, ownership, operating rules and acceptance are set during project design.
Layer 04
Integration boundary
Define interfaces between toll plaza technology, its connected systems and the owner's existing environment.
The toll plaza technology scope connects ANPR / LPR, Boom Barriers, Intelligent Traffic Systems through agreed interfaces, network and power dependencies, operating roles and commissioning criteria. Final system selection and interfaces are confirmed against project requirements.
Systems
Systems involved
Typical applications
Delivery approach
From brief through integrated handover.
01
Survey movement patterns, lane geometry and peak demand
02
Design field devices, safe control and communications
03
Integrate local systems with management workflows
04
Test exceptions, degraded operation and reporting
Business units
Delivered by
Insights
Related technical reading
- 01Understand
- 02Design
- 03Select
- 04Deliver
- 05Integrate
- 06Test & Commission
- 07Train & Support
Planning toll plaza technology?
Share the project, location and stage. Documents can be shared after the initial enquiry if needed.
Discuss a Project